REQ-005 — Load transient ≤ 1% overshoot, recovery ≤ 5µs
approved · Performance · Approved by migrated
Statement
Output voltage overshoot and undershoot on a 0A→1.5A load step shall not exceed 1% of setpoint, with recovery within 5µs.
Acceptance Criteria
0A→1.5A load step applied per channel; peak overshoot/undershoot ≤ 1% of VOUT setpoint (≤240mV at 24V); output returns to within ±1% of setpoint within 5µs. Both channels active.
Linked Test Cases
| Code | Title | Status |
|---|---|---|
TC-P-02 |
Load transient — 0→1.5A step response (Ch1 & Ch2) | open |
TC-P-00 |
Load regulation — 0→1.5A at 24V (Ch1 & Ch2) | open |
TC-P-03 |
Power efficiency — 5–24V sweep at 1A (Ch1 & Ch2) | open |
Sign-offs
No sign-offs recorded. Approving a requirement records one here.