Smoke Test
ESH99999999 · Rev R0
Generated 2026-06-05 18:18 UTC
Coverage
0%
Done
0%
Requirements
0
Test Cases
5
Records
0
Requirements
| Code | Status | Category | Title | Statement | Acceptance |
|---|---|---|---|---|---|
| REQ-EL-001 | draft | compliance | RoHS Compliance | The design shall use only RoHS-compliant materials. All BOM items must have a valid RoHS certificate of compliance. | Valid RoHS certificate of compliance on file for all BOM line items. |
| REQ-EL-002 | draft | compliance | REACH / SVHC Declaration | The design shall comply with the REACH regulation. Any SVHC present above 0.1 % w/w in any article shall be declared. | REACH/SVHC declaration obtained from all component suppliers and filed in the project documentation. |
| REQ-EL-003 | draft | compliance | EMC Compliance | The design shall comply with applicable EMC standards for conducted and radiated emissions. | Pass pre-compliance scan and, where required, certified lab test. |
| REQ-EL-004 | draft | environmental | Operating Temperature Range | The design shall operate correctly and without damage across the full ambient temperature range specified in the design brief. | Functional test passes at minimum and maximum rated ambient in an environmental chamber. |
| REQ-EL-005 | draft | robustness | ESD Protection | All external interfaces shall tolerate ESD events of at least ±4 kV (contact) and ±8 kV (air) per IEC 61000-4-2 without permanent damage or loss of function. | ESD test passes at specified levels with no permanent damage. |
Test Cases
| Code | Status | Category | Title / Signal | Target | Pass Criterion | Linked REQ |
|---|---|---|---|---|---|---|
| TC-EL-001 | open | compliance | RoHS CoC Collection | — | Obtain and file RoHS certificate of compliance for each BOM line item before releasing the design to production. | REQ-EL-001 |
| TC-EL-002 | open | compliance | REACH Declaration Collection | — | Obtain REACH/SVHC declaration from each component supplier; file in the project documentation. | REQ-EL-002 |
| TC-EL-003 | open | compliance | EMC Pre-Compliance Scan | — | Run conducted and radiated emissions scan; verify results are below applicable limits. | REQ-EL-003 |
| TC-EL-004 | open | environmental | Temperature Range Functional Test | — | Operate unit at minimum and maximum rated ambient for at least 30 minutes each; verify correct function and no damage. | REQ-EL-004 |
| TC-EL-005 | open | robustness | ESD Immunity Test | — | Apply ESD events to all external connectors per IEC 61000-4-2 at ±4 kV contact / ±8 kV air; verify no permanent damage or loss of function. | REQ-EL-005 |
Verification Records
No verification records.