My best project
ESH-MBP · Rev R0
Generated 2026-06-05 18:18 UTC
Coverage
0%
Done
0%
Requirements
0
Test Cases
7
Records
0
Requirements
| Code | Status | Category | Title | Statement | Acceptance |
|---|---|---|---|---|---|
| REQ-EL-001 | draft | compliance | RoHS Compliance | The design shall use only RoHS-compliant materials. All BOM items must have a valid RoHS certificate of compliance. | Valid RoHS certificate of compliance on file for all BOM line items. |
| REQ-EL-002 | draft | compliance | REACH / SVHC Declaration | The design shall comply with the REACH regulation. Any SVHC present above 0.1 % w/w in any article shall be declared. | REACH/SVHC declaration obtained from all component suppliers and filed in the project documentation. |
| REQ-EL-003 | draft | compliance | EMC Compliance | The design shall comply with applicable EMC standards for conducted and radiated emissions. | Pass pre-compliance scan and, where required, certified lab test. |
| REQ-EL-004 | draft | environmental | Operating Temperature Range | The design shall operate correctly and without damage across the full ambient temperature range specified in the design brief. | Functional test passes at minimum and maximum rated ambient in an environmental chamber. |
| REQ-EL-005 | draft | robustness | ESD Protection | All external interfaces shall tolerate ESD events of at least ±4 kV (contact) and ±8 kV (air) per IEC 61000-4-2 without permanent damage or loss of function. | ESD test passes at specified levels with no permanent damage. |
| REQ-EL-006 | draft | compliance | CE Marking Applicability | CE marking applicability shall be assessed at project start. If the product is placed on the EU / EEA market, it shall be CE-marked per the applicable EU directives (typically LVD, EMC Directive, RoHS Directive, and RED if any radio equipment), with a signed Declaration of Conformity on file. If the product is NOT placed on the EU / EEA market, the market scope decision shall be recorded as a `please_decision_create` so CE assessment can be skipped knowingly. | CE marking applicability assessed and the assessment recorded as a `please_decision`. For products in EU/EEA market scope: applicable EU directives identified, conformity assessment complete, signed Declaration of Conformity on file, CE mark properly affixed. For products outside EU/EEA market scope: a `please_decision` documents the market scope and the CE-skip rationale. |
| REQ-EL-007 | draft | quality | Test Limit Derivation Documented | Every test case that defines numeric measurement limits (low_limit, high_limit, nominal, tolerancePct) shall have a documented derivation explaining how those limits were chosen. | For each test case with numeric limits, evidence of derivation exists — `passCriterion` references the component values and tolerances in the measurement path, OR a linked `please_decision` documents the corner math, OR the implementing Maestro YAML carries a `Limit derivation` comment block citing such a decision. |
Test Cases
| Code | Status | Category | Title / Signal | Target | Pass Criterion | Linked REQ |
|---|---|---|---|---|---|---|
| TC-EL-001 | open | compliance | RoHS CoC Collection | — | Obtain and file RoHS certificate of compliance for each BOM line item before releasing the design to production. | REQ-EL-001 |
| TC-EL-002 | open | compliance | REACH Declaration Collection | — | Obtain REACH/SVHC declaration from each component supplier; file in the project documentation. | REQ-EL-002 |
| TC-EL-003 | open | compliance | EMC Pre-Compliance Scan | — | Run conducted and radiated emissions scan; verify results are below applicable limits. | REQ-EL-003 |
| TC-EL-004 | open | environmental | Temperature Range Functional Test | — | Operate unit at minimum and maximum rated ambient for at least 30 minutes each; verify correct function and no damage. | REQ-EL-004 |
| TC-EL-005 | open | robustness | ESD Immunity Test | — | Apply ESD events to all external connectors per IEC 61000-4-2 at ±4 kV contact / ±8 kV air; verify no permanent damage or loss of function. | REQ-EL-005 |
| TC-EL-006 | open | compliance | CE Marking + Declaration of Conformity Audit | — | Confirm a `please_decision` records the CE applicability assessment. For products in EU/EEA market scope: confirm applicable EU directives are identified, conformity assessment is complete, signed Declaration of Conformity is on file, and CE mark is affixed per directive requirements. For products outside EU/EEA market scope: confirm the `please_decision` documents the market scope and CE-skip rationale. | REQ-EL-006 |
| TC-EL-007 | open | quality | Limit Derivation Audit | — | For each test case in this project that has numeric limits, confirm at least one derivation source exists: (a) `passCriterion` field includes tolerance / component references, OR (b) a `please_decision` is linked covering the limit derivation, OR (c) the implementing Maestro YAML has a `Limit derivation` comment block citing a decision id. Reference example: PT-SIG.04 + `please_decision` D.03 in projectId 1. | REQ-EL-007 |
Verification Records
No verification records.
Design Rule Status
■ No violations ■ Warning ■ Error ■ Waived