Live demo — data resets daily at 03:00 UTC. Nothing you enter is saved.

Sparrow complete product

ESH10000633 Β· Rev R1

in_progresselectronics

System-level Sparrow product. Test implementation lives in Maestro TAT package ESH10000633_SparrowUnitTest_v01 (https://github.com/esharpab/testdevelopment-esharp-tat-registry-ESH10000633_SparrowUnitTest_v01).

Everything here lives inside a Project (a code + revision, e.g. ESH10000540 R3). The backbone is the V-model, read top-to-bottom: define what the product must do, plan how to prove it, execute the proof on real units, then learn from the field β€” and the Loop closes back up to the top.
This map is live: a block is green with a count when this project actually has that entity, and dashed/dim when it’s empty. Click any block to open its tab; hover for details. Arrows are the meaningful links; the implicit β€œbelongs to this Project” edge is left out for legibility.

What each thing means

Requirement
One thing the product must do or satisfy β€” the β€œwhat”.
Test Case
A defined check that proves one or more requirements β€” the β€œhow we prove it”. A verified_by trace link ties a test case to the requirement(s) it covers; that link is exactly what Coverage % counts. (So: a test case refers to the requirements it verifies.)
Verification Plan
A named grouping of test cases, approved before a test campaign and optionally gated by a milestone.
Verification Record
The result of running one test case against one unit: pass / fail / error / na. This is the evidence a requirement is actually met.
DUT
Device Under Test β€” an individual physical unit (by serial number) that records and test data attach to.
Deviation
A documented waiver against a verification record (e.g. accept a known non-conformance, with justification).
Entry
A knowledge note: a decision (settled choice), notice (assumption / risk / open question), issue (tracked problem), or concept (idea under exploration). It can attach to any other entity.
Design Rule
A reusable, checkable engineering constraint. Running the checks turns each violation into a Conflict.
Conflict
An open flag raised by a failed design-rule check (or an end-of-life / component-library issue) that needs resolving.
Milestone
A dated gate; verification plans can be tied to it.
Field Issue (RMA)
A failure reported from the field on a returned unit; Root-Cause Analysis explains why it happened.
The Loop (S-16)
loop_trace reconciles a field issue against that unit’s own verification record (did it pass at the edge of the band?). closes_loop records the corrective decision or design rule so the lesson is captured β€” and clears the project’s open-loop count.
Interface / Port
A contract between projects; each port can be driven by a requirement (and cascade one into the connected project).
BOM Component
A part on this project’s bill of materials, optionally linked to the shared Component Library.
GRR Study
A Gauge R&R study measuring how repeatable a test case’s measurement is.
Test Data
Production / Maestro run results recorded against DUTs β€” the population behind a single verification record.
0% Coverage
0% Done
0 Requirements
68 Test Cases
13 Open Entries

Timeline

Color = derived gate state Β· hover a tile for its note.
cancelled
Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved)
May 15, 2026
cancelled
Gate 2 — Inventory Procurement (all shortfalls resolved; ESH10000182 build order confirmed)
Jun 5, 2026
cancelled
Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined)
Jun 5, 2026
cancelled
Gate 4 — First Article (S/N 001 assembled and passed production test)
Jun 12, 2026
marker
Schema test
Jun 15, 2026
cancelled
Gate 5 — Production Run (20 systems assembled + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786)
Jul 6, 2026
cancelled
Gate 6 — Delivery (final QC, packaging, delivery documentation complete)
Jul 13, 2026
not started
🏁 Release
Β· 3/6

Status & gates

Chronological β€” Release is the final gate. Derived & read-only; edit via trace_milestone_* tools.
MS-G1Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved) cancelleddue 2026-05-15
MS-G2Gate 2 — Inventory Procurement (all shortfalls resolved; ESH10000182 build order confirmed) cancelleddue 2026-06-05
MS-G3Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined) cancelleddue 2026-06-05
MS-G4Gate 4 — First Article (S/N 001 assembled and passed production test) cancelleddue 2026-06-12
TEST_MILESTONE_TO_CHECK_SCHEMASchema test markerdue 2026-06-15
MS-G5Gate 5 — Production Run (20 systems assembled + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786) cancelleddue 2026-07-06
MS-G6Gate 6 — Delivery (final QC, packaging, delivery documentation complete) cancelleddue 2026-07-13
Release / Readiness not started 3/6 met
pending Requirements approved
  • PWR-26: draft
  • PWR-31: draft
  • PWR-12: draft
  • PWR-13: draft
  • PWR-15: draft
  • SIG-14: draft
  • SIG-04: draft
  • SIG-06: draft
  • SIG-05: draft
  • SIG-07: draft
pending Coverage ≥ 100%
  • No requirements in scope
pending All test cases pass
  • 28/68 passed
  • 40 not yet run
met No blocking issues open
met Deviations resolved
met Interfaces frozen
Attention 9 open entries
Composition 11 dependencies need attention: ESH10000534 R4 (amber), ESH10000535 R3 (amber), ESH10000536 R2 (amber), ESH10000540 R3 (amber), ESH10000543 R2 (amber), ESH10000634 R3 (amber), ESH10000631 R1 (amber), ESH10000636 R1 (amber), ESH10000582 R1.0 (amber), ESH10000614 R0 (amber), ESH10000637 R0 (amber)

Test Cases

28 Pass 0 Fail / Deviated 0 N/A 40 Open10 / 68 Maestro impl.

Coverage β€” 0.0% Β· Done β€” 0.0%

74 of 74
CodeTitleCategoryCoverageStatus
COM-01 I2C Controller end-to-end Communicationβ€”β€”
COM-02 I2C fast-mode operation Communicationβ€”β€”
COM-03 I2C Device EEPROM 24AA02UID Communicationβ€”β€”
COM-04 SPI AD5592R devices accessible Communicationβ€”β€”
COM-05 RS485 full-duplex Communicationβ€”β€”
COM-06 I2C Controller signal levels (EXT_VIO-relative) Communicationβ€”β€”
COM-07 I2C onboard pull-ups + VDDA_SEL coordination Communicationβ€”β€”
COM-08 RS485 differential measurement + electrical limits Communicationβ€”β€”
COM-09 RS485 fault protection + fail-safe bias Communicationβ€”β€”
COS-01 Power LED Cosmeticβ€”β€”
COS-02 RS-232 LED Cosmeticβ€”β€”
COS-03 User LEDs (LP5012) respond Cosmeticβ€”β€”
FW-01 ATmega MCU on I2C Firmwareβ€”β€”
FW-02 IDPROM writable Firmwareβ€”β€”
PWR-01 Common 12V rail Powerβ€”β€”
PWR-02 Common 5V rail Powerβ€”β€”
PWR-03 12V_EXT external rail Powerβ€”β€”
PWR-04 3V3_EXT external rail Powerβ€”β€”
PWR-05 1V8_EXT external rail Powerβ€”β€”
PWR-06 VADJ programmable rail Powerβ€”β€”
PWR-07 EXT_VIO programmable rail Powerβ€”β€”
PWR-08 VREF precision reference Powerβ€”β€”
PWR-09 External rails OCP Powerβ€”β€”
PWR-10 External rail VMEAS accuracy Powerβ€”β€”
PWR-11 External rail IMEAS accuracy Powerβ€”β€”
PWR-12 N-Top +18V rail Powerβ€”β€”
PWR-13 N-Top −18V rail Powerβ€”β€”
PWR-14 PoE input range Powerβ€”β€”
PWR-15 PoE maximum output power Powerβ€”β€”
PWR-16 PoE VMEAS accuracy Powerβ€”β€”
PWR-17 PoE IMEAS accuracy Powerβ€”β€”
PWR-18 Active Load source voltage range Powerβ€”β€”
PWR-19 Active Load sink current (IDC) Powerβ€”β€”
PWR-20 Active Load sink current (Phoenix) Powerβ€”β€”
PWR-21 Active Load energy limit Powerβ€”β€”
PWR-22 Active Load VMEAS accuracy Powerβ€”β€”
PWR-23 Active Load IMEAS accuracy Powerβ€”β€”
PWR-24 PSU (optional) range and accuracy Powerβ€”β€”
PWR-25 Common 12V / 5V rail current protection Powerβ€”β€”
PWR-26 External rail OCP transient blanking + fast-trip Powerβ€”β€”
PWR-27 External rail slew control (SRON) + bleed-out Powerβ€”β€”
PWR-28 PoE Class 1–8 support + 2-pair/4-pair delivery Powerβ€”β€”
PWR-29 PoE polarity indication LED Powerβ€”β€”
PWR-30 PoE port-power limits, classification + protection Powerβ€”β€”
PWR-31 Active Load protection mechanisms Powerβ€”β€”
REQ-EL-001 RoHS Compliance complianceβ€”β€”
REQ-EL-002 REACH / SVHC Declaration complianceβ€”β€”
REQ-EL-003 EMC Compliance complianceβ€”β€”
REQ-EL-004 Operating Temperature Range environmentalβ€”β€”
REQ-EL-005 ESD Protection robustnessβ€”β€”
REQ-EL-006 CE Marking Applicability complianceβ€”β€”
REQ-EL-007 Test Limit Derivation Documented qualityβ€”β€”
SIG-01 MPIO 0–5 V (4 channels) Signalβ€”β€”
SIG-02 FE_MPIO OV-protected (12 channels) Signalβ€”β€”
SIG-03 Differential AIN precision (8 channels) Signalβ€”β€”
SIG-04 PWM programmable (2 channels) Signalβ€”β€”
SIG-05 Tach input (2 channels) Signalβ€”β€”
SIG-06 Relay driver low-side (4 channels) Signalβ€”β€”
SIG-07 Fixed Load 2.2 kΩ (4 channels) Signalβ€”β€”
SIG-08 Audio Load (phantom/bias) Signalβ€”β€”
SIG-09 Tampering latch-and-hold (2 channels) Signalβ€”β€”
SIG-10 USR_GPIO functional Signalβ€”β€”
SIG-11 AUDIO_GND ↔ system GND galvanic link Signalβ€”β€”
SIG-12 MPIO floating-input pulldown Signalβ€”β€”
SIG-13 FE_MPIO fault-protected analog switches Signalβ€”β€”
SIG-14 Differential AIN PGA gain settings + auto-scale Signalβ€”β€”
SIG-15 MPIO/FE_MPIO load constraints for full accuracy Signalβ€”β€”
SYS-01 Sub-assemblies installed and seated Systemβ€”β€”
SYS-02 Fixture Link silkscreen revision marking Systemβ€”β€”
SYS-03 Power-on from 20 V DC via Fixture Link eFuse Systemβ€”β€”
SYS-04 PoE subsystem accepts 44–57 V isolated input Systemβ€”β€”
SYS-05 Sparrow Fixture Electronics PCBA dimensions Systemβ€”β€”
SYS-06 Accordion Agent enclosure dimensions Systemβ€”β€”
SYS-07 Production test must exercise every user-accessible pin Systemβ€”β€”