REQ-001 — Test station HW BOM revised to R1.0

draft · Hardware

Statement

The test station hardware BOM shall be revised from R0.0 to R1.0, removing the Accordion A1 and integrating the Accordion A2 (with PSU module) as the replacement programmable PSU feeding the B12 CRPS Test Adapter and B6_Production_test_board.

Acceptance Criteria

R1.0 BOM is approved; Accordion A1 is physically removed from the station; Accordion A2 with PSU module is installed and operational.

Sign-offs