Live demo — data resets daily at 03:00 UTC. Nothing you enter is saved.

REQ-002 — Accordion A2 BOM updated to include PSU module

draft · Hardware

Statement

The Accordion A2 unit installed in the B12 CB test station shall have its BOM updated to include the PSU module, which is absent from the current A2 configuration.

Acceptance Criteria

A2 BOM revision includes the PSU module; unit is physically assembled with PSU module installed and verified operational before station integration.

Sign-offs

No sign-offs recorded. Approving a requirement records one here.