Live demo — data resets daily at 03:00 UTC. Nothing you enter is saved.

REQ-047 — Power Source Selection

approved · Functional · Approved by demo

Statement

USB-C supply shall be prioritised over battery when both are connected. Simultaneous charging and system operation shall be supported.

Acceptance Criteria

With USB-C and battery both connected, system runs from USB-C while battery charges simultaneously.

Linked Test Cases

CodeTitleStatus
TC-P-01 Charge current measurement pass

Sign-offs

StageSigned byRoleWhenAttestation
approved demo 2026-06-05 06:42