Milestone Gates
Timeline →Timeline
Color = derived gate state · hover a tile for its note.marker
Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved)
marker
Gate 2 — Inventory Procurement (all shortfalls resolved; ESH10000182 build order confirmed)
marker
Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined)
marker
Gate 4 — First Article (S/N 001 assembled and passed production test)
marker
Gate 5 — Production Run (20 systems assembled + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786)
marker
Gate 6 — Delivery (final QC, packaging, delivery documentation complete)
not started
🏁 Release
MS-G1Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved)
markerdue 2026-05-15MS-G2Gate 2 — Inventory Procurement (all shortfalls resolved; ESH10000182 build order confirmed)
markerdue 2026-06-05MS-G3Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined)
markerdue 2026-06-05MS-G4Gate 4 — First Article (S/N 001 assembled and passed production test)
markerdue 2026-06-12MS-G5Gate 5 — Production Run (20 systems assembled + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786)
markerdue 2026-07-06MS-G6Gate 6 — Delivery (final QC, packaging, delivery documentation complete)
markerdue 2026-07-13Release / Readiness not started 2/6 met
pending Requirements approved
- PWR-26: draft
- PWR-31: draft
- PWR-12: draft
- PWR-13: draft
- PWR-15: draft
- SIG-14: draft
- SIG-04: draft
- SIG-06: draft
- SIG-05: draft
- SIG-07: draft
pending Coverage ≥ 100%
- No requirements in scope
pending All test cases pass
- 25/67 passed
- 42 not yet run
pending No blocking issues open
- E-001: open blocker
- E-004: open blocker
- E-022: open blocker
met
Deviations resolved
met
Interfaces frozen