Sparrow Production Readiness R1

ETT00000002 · Rev R0

in_progressgenericinformalAvstämning

Everything here lives inside a Project (a code + revision, e.g. ESH10000540 R3). The backbone is the V-model, read top-to-bottom: define what the product must do, plan how to prove it, execute the proof on real units, then learn from the field — and the Loop closes back up to the top.
This map is live: a block is green with a count when this project actually has that entity, and dashed/dim when it’s empty. Click any block to open its tab; hover for details. Arrows are the meaningful links; the implicit “belongs to this Project” edge is left out for legibility.

What each thing means

Requirement
One thing the product must do or satisfy — the “what”.
Test Case
A defined check that proves one or more requirements — the “how we prove it”. A verified_by trace link ties a test case to the requirement(s) it covers; that link is exactly what Coverage % counts. (So: a test case refers to the requirements it verifies.)
Verification Plan
A named grouping of test cases, approved before a test campaign and optionally gated by a milestone.
Verification Record
The result of running one test case against one unit: pass / fail / error / na. This is the evidence a requirement is actually met.
DUT
Device Under Test — an individual physical unit (by serial number) that records and test data attach to.
Deviation
A documented waiver against a verification record (e.g. accept a known non-conformance, with justification).
Entry
A knowledge note: a decision (settled choice), notice (assumption / risk / open question), issue (tracked problem), or concept (idea under exploration). It can attach to any other entity.
Design Rule
A reusable, checkable engineering constraint. Running the checks turns each violation into a Conflict.
Conflict
An open flag raised by a failed design-rule check (or an end-of-life / component-library issue) that needs resolving.
Milestone
A dated gate; verification plans can be tied to it.
Field Issue (RMA)
A failure reported from the field on a returned unit; Root-Cause Analysis explains why it happened.
The Loop (S-16)
loop_trace reconciles a field issue against that unit’s own verification record (did it pass at the edge of the band?). closes_loop records the corrective decision or design rule so the lesson is captured — and clears the project’s open-loop count.
Interface / Port
A contract between projects; each port can be driven by a requirement (and cascade one into the connected project).
BOM Component
A part on this project’s bill of materials, optionally linked to the shared Component Library.
GRR Study
A Gauge R&R study measuring how repeatable a test case’s measurement is.
Test Data
Production / Maestro run results recorded against DUTs — the population behind a single verification record.
0% Coverage
0% Done
0 Requirements
3 Blockers
12 Open Entries

Timeline

Color = derived gate state · hover a tile for its note.
achieved
Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved)
May 15, 2026
achieved
Gate 2 — Inventory Procurement (superseded by MS-G3B + MS-G5)
Jun 5, 2026
marker
Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined)
Jun 5, 2026
overdue / blocked
First Article BOM Complete (parts for 2 units, ETA 2026-06-09)
Jun 9, 2026· 4/6
overdue / blocked
Gate 4 — First Article (S/N 001 assembled and passed production test)
Jun 12, 2026· 2/5
overdue / blocked
Gate 5 — Production Run (20 systems + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786)
Jul 6, 2026· 0/10
overdue / blocked
Gate 6 — Delivery (final QC, packaging, delivery documentation complete)
Jul 13, 2026· 0/1
not started
🏁 Release
· 0/4

Status & gates

Chronological — Release is the final gate. Derived & read-only; edit via trace_milestone_* tools.
MS-G1Gate 1 — Design Release (all sub-assemblies at Manufacturing in MES; ESH10000634 R3 approved) achieveddue 2026-05-15
MS-G2Gate 2 — Inventory Procurement (superseded by MS-G3B + MS-G5) achieveddue 2026-06-05
MS-G3Gate 3 — Test & Production Infrastructure (ESH10000654 verified; test procedure complete; DUT serials defined) markerdue 2026-06-05
MS-G3BFirst Article BOM Complete (parts for 2 units, ETA 2026-06-09) overdue / blocked 4/6 metdue 2026-06-09
pending Blocked by E-046: ESH10000539 R2 — 60 raw PCBs in-house, assembly ETA 2026-06-05; Sparrow allocation 2+18
  • E-046 still open
met Blocked by E-045: 2026-05-28: ESH10000158 — 40 pcs R6 delivered; build preference R6-only, contingent on R5↔R6 diff + acceptance
pending Blocked by E-047: ESH10000539 — verify R67 + R61 mounted (R2 BOM) before any board enters Sparrow; R1 stock IS patchable
  • E-047 still open
met Blocked by E-048: ESH10000158 R6 — reflow ETA 2026-06-05 (Darek); Sparrow allocation 2+18
met Blocked by E-049: ESH10000534 R4 (M2Top PoE) — 28 pcs in-house assembly, ETA 2026-06-05
met Blocked by E-050: ESH10000634 R3 (Sparrow IDC N-Top) — 50 pcs in-house assembly, ETA 2026-06-05
MS-G4Gate 4 — First Article (S/N 001 assembled and passed production test) overdue / blocked 2/5 metdue 2026-06-12
pending Blocked by E-041: 2026-06-03: Use OLD revs of ESH10000522 / ESH10000544 / ESH10000572 for first article build
  • E-041 still open
pending Blocked by E-060: Talk to Felix — Sparrow Accordion top lid fastening; are the specified spacers good?
  • E-060 still open
met Blocked by E-061: ESH10000636 BOM completeness — fan, heatsink, gap-filler, screws missing from MES BOM? (Elsa to verify)
met Blocked by E-062: ESH10000636 BOM — EGP10001723 SSW-110-04-G-D should NOT be on this BOM (Elsa to verify)
pending After MS-G3B: First Article BOM Complete (parts for 2 units, ETA 2026-06-09)
  • MS-G3B not yet achieved
MS-G5Gate 5 — Production Run (20 systems + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786) overdue / blocked 0/10 metdue 2026-07-06
pending Blocked by E-051: G-05: ESH10000637 (PSU Power Cable) — need 40, stock 0 — BUILD in-house (Elsa to coordinate)
  • E-051 still open
pending Blocked by E-052: G-06: EPN1000677 (5-port USB wall charger) — 2 short of 20-unit need (Elsa to order)
  • E-052 still open
pending Blocked by E-053: ESH10000183 (Accordion A2 Top PCBA, R6) — 25 pcs incoming, ETA 2026-06-12
  • E-053 still open
pending Blocked by E-054: Test fixture with tablet for Sparrow — initial conversation with Felix (2026-05-28)
  • E-054 still open
pending Blocked by E-055: Operator instructions needed — assemble + test procedure for Sparrow Complete Product
  • E-055 still open
pending Blocked by E-056: ESH10000571 (N-Top Kontaktkropp) — 20 pcs on order ETA 2026-06-25; first article covered
  • E-056 still open
pending Blocked by E-057: ESH10000536 R2 (M2Top Active Load) — 40 new PCBs on order ETA 2026-06-25; 20 pcs Sparrow spare ETA 2026-07-10
  • E-057 still open
pending Blocked by E-058: EPN1000068 (RPi Fan) — short 5 vs need 20; ORDER (Elsa)
  • E-058 still open
pending Blocked by E-059: EPN1000439 (Hammond box blue) — 20 stock vs 20 need (no margin); ORDER (Elsa)
  • E-059 still open
pending After MS-G4: Gate 4 — First Article (S/N 001 assembled and passed production test)
  • MS-G4 not yet achieved
MS-G6Gate 6 — Delivery (final QC, packaging, delivery documentation complete) overdue / blocked 0/1 metdue 2026-07-13
pending After MS-G5: Gate 5 — Production Run (20 systems + standalone deliverables 10×636, 20×614, 20×637, 20×EPN1000786)
  • MS-G5 not yet achieved
Release / Readiness not started 0/4 met
pending Requirements approved
  • No requirements in scope
pending Coverage ≥ 100%
  • No requirements in scope
pending All test cases pass
  • No test cases in scope
pending No blocking issues open
  • E-055: open blocker
  • E-046: open blocker
  • E-047: open blocker
Composition 2 dependencies need attention: ESH10000633 R1 (amber), ESH10000654 R0 (amber)

Coverage — 0.0% · Done — 0.0%

0 of 0
CodeTitleCategoryCoverageStatus