Live demo — data resets daily at 03:00 UTC. Nothing you enter is saved.

Accordion Beacon Module

ESH10000671 Β· Rev R0

in_progresselectronics

Battery-powered WiFi module that extends a Raspberry Pi's serial bus (I2C, UART, SPI) over WiFi using MQTT. SX1276 LoRa 868 MHz transceiver supplements WiFi for long-range parallel operation. LiPo powered with USB-C charging (BQ24075), 3.3V LDO (MCP1700), ESP32-C6-MINI-1-N4 MCU.

Everything here lives inside a Project (a code + revision, e.g. ESH10000540 R3). The backbone is the V-model, read top-to-bottom: define what the product must do, plan how to prove it, execute the proof on real units, then learn from the field β€” and the Loop closes back up to the top.
This map is live: a block is green with a count when this project actually has that entity, and dashed/dim when it’s empty. Click any block to open its tab; hover for details. Arrows are the meaningful links; the implicit β€œbelongs to this Project” edge is left out for legibility.

What each thing means

Requirement
One thing the product must do or satisfy β€” the β€œwhat”.
Test Case
A defined check that proves one or more requirements β€” the β€œhow we prove it”. A verified_by trace link ties a test case to the requirement(s) it covers; that link is exactly what Coverage % counts. (So: a test case refers to the requirements it verifies.)
Verification Plan
A named grouping of test cases, approved before a test campaign and optionally gated by a milestone.
Verification Record
The result of running one test case against one unit: pass / fail / error / na. This is the evidence a requirement is actually met.
DUT
Device Under Test β€” an individual physical unit (by serial number) that records and test data attach to.
Deviation
A documented waiver against a verification record (e.g. accept a known non-conformance, with justification).
Entry
A knowledge note: a decision (settled choice), notice (assumption / risk / open question), issue (tracked problem), or concept (idea under exploration). It can attach to any other entity.
Design Rule
A reusable, checkable engineering constraint. Running the checks turns each violation into a Conflict.
Conflict
An open flag raised by a failed design-rule check (or an end-of-life / component-library issue) that needs resolving.
Milestone
A dated gate; verification plans can be tied to it.
Field Issue (RMA)
A failure reported from the field on a returned unit; Root-Cause Analysis explains why it happened.
The Loop (S-16)
loop_trace reconciles a field issue against that unit’s own verification record (did it pass at the edge of the band?). closes_loop records the corrective decision or design rule so the lesson is captured β€” and clears the project’s open-loop count.
Interface / Port
A contract between projects; each port can be driven by a requirement (and cascade one into the connected project).
BOM Component
A part on this project’s bill of materials, optionally linked to the shared Component Library.
GRR Study
A Gauge R&R study measuring how repeatable a test case’s measurement is.
Test Data
Production / Maestro run results recorded against DUTs β€” the population behind a single verification record.
100% Coverage
35% Done
34 Requirements
47 Test Cases
2 Blockers
24 Open Entries

Timeline

Color = derived gate state Β· hover a tile for its note.
marker
Bring-up
Jun 5, 2026
overdue / blocked
Base Functions Verified
Jun 12, 2026Β· 0/1
overdue / blocked
WiFi Functionality Verified
Jun 19, 2026Β· 0/1
overdue / blocked
LoRa Functionality Verified
Jun 26, 2026Β· 0/1
overdue / blocked
Battery Functionality Verified
Jul 3, 2026Β· 0/1
overdue / blocked
Verification Wrap-Up
Jul 10, 2026Β· 0/1
marker
Release
Jul 17, 2026
not started
🏁 Release
Β· 4/6

Status & gates

Chronological β€” Release is the final gate. Derived & read-only; edit via trace_milestone_* tools.
MS-001Bring-up markerdue 2026-06-05
MS-002Base Functions Verified overdue / blocked 0/1 metdue 2026-06-12
pending Plan PLAN-001 — Base Functions
  • 12/23 passed
  • 11 not yet run
MS-003WiFi Functionality Verified overdue / blocked 0/1 metdue 2026-06-19
pending Plan PLAN-002 — WiFi Functionality
  • 2/5 passed
  • 3 not yet run
MS-004LoRa Functionality Verified overdue / blocked 0/1 metdue 2026-06-26
pending Plan PLAN-003 — LoRa Functionality
  • 1/4 passed
  • 3 not yet run
MS-005Battery Functionality Verified overdue / blocked 0/1 metdue 2026-07-03
pending Plan PLAN-004 — Battery Functionality
  • 0/6 passed
  • 6 not yet run
MS-006Verification Wrap-Up overdue / blocked 0/1 metdue 2026-07-10
pending Plan PLAN-005 — Verification Wrap-Up
  • 0/3 passed
  • 3 not yet run
MS-007Release markerdue 2026-07-17
Release / Readiness not started 4/6 met
met Requirements approved
met Coverage ≥ 100%
  • 34/34 requirements covered (100%)
pending All test cases pass
  • 15/47 passed
  • 32 not yet run
pending No blocking issues open
  • E-023: open blocker
  • E-028: open blocker
met Deviations resolved
met Interfaces frozen

Test Cases

15 Pass 0 Fail / Deviated 0 N/A 32 Open0 / 47 Maestro impl.

Coverage β€” 100.0% Β· Done β€” 35.3%

42 of 42
CodeKindTitleSeverityScopeStatusMilestoneCreated
C-001 notice REQ-046 has no test case — add one to verify it? info action withdrawn β€” 2026-06-05
C-002 notice REQ-052 has no test case — add one to verify it? info action withdrawn β€” 2026-06-05
C-003 notice REQ-051 has no test case — add one to verify it? info action withdrawn β€” 2026-06-05
C-004 notice REQ-053 has no test case — add one to verify it? info action withdrawn β€” 2026-06-05
C-005 notice REQ-059 has no test case — add one to verify it? info action withdrawn β€” 2026-06-05
E-001 decision Bus pin assignments for ESP32-C6 info record closed β€” 2026-05-26
E-002 decision KiCad schematic sheet structure — 4 sheets info record closed β€” 2026-05-26
E-003 decision BQ24075T passive network configuration info record closed β€” 2026-05-26
E-004 decision PI4IOE5V6416ZDEX I2C address and port allocation info record closed β€” 2026-05-26
E-005 decision ADS7828 I2C address 0x48 info record closed β€” 2026-05-26
E-006 decision J_EXT connector pinout (AXK5S60047) — deviations from reference info record closed β€” 2026-05-26
E-007 decision UART0 TX/RX test access via 1×2 2.54 mm pin headers info record closed β€” 2026-05-26
E-008 decision Battery current sense — INA333 + 100 mΩ shunt + AO3407 PMOS power-gate info record closed β€” 2026-05-26
E-009 decision SX1276 32 MHz crystal — ECS-320-10-37B-CKY-TR3 for R0 prototype info record closed β€” 2026-05-26
E-010 concept Accordion Wireless Serial Bus Bridge info record open β€” 2026-06-05
E-011 notice C19 BOM deviation — 2u2 fitted instead of 4u7 (all R0 units) info action closed β€” 2026-06-05
E-012 issue USB-C connector EOL — R0 units modified, R1 to use 12401899E412A warning next_revision open β€” 2026-06-05
E-013 issue BQ24075 EN1 incorrectly pulled HIGH by R1 → Standby mode, OUT disabled warning next_revision open β€” 2026-06-05
E-014 issue USB-CDC flashing unreliable — COM3 intermittently unavailable on Windows warning record open β€” 2026-06-06
E-015 notice Brownout detector (BOD) disabled — must be configured before production warning next_revision open β€” 2026-06-06
E-016 issue NVS provisioning use-after-free bug — fixed build not yet flashed warning record open β€” 2026-06-06
E-017 issue WiFi RF PLL calibration fails on warm reset — USB power cycle required warning next_revision open β€” 2026-06-06
E-018 decision Two-bus I2C architecture: LP_I2C for internal peripherals, I2C0 for external MQTT bridge info record open β€” 2026-06-06
E-019 decision MQTT topic structure: beacon/<device_id>/<function>/<direction> info record open β€” 2026-06-06
E-020 decision Device identity: MAC-based temporary ID with NVS serial override via provisioning info record open β€” 2026-06-06
E-021 issue ADS7828 (U6) VCC decoupling cap C28 missing on A003460 — probable cause of erratic ADC readings warning record open β€” 2026-06-07
E-022 issue INA333 gain fixed at G≈2 — A2 first-stage output clamps at GND for low-side sensing at high gain warning next_revision open β€” 2026-06-08
E-023 issue J3 external connector shorts 3V3 to GND when external device connected blocking action open β€” 2026-06-08
E-024 decision R1: Replace INA333 + ADS7828 with INA226 for battery current and voltage monitoring info next_revision open β€” 2026-06-08
E-025 concept Raspberry Pi as local offline IoT hub with dual-AP provisioning for ESP32 devices info record open β€” 2026-06-08
E-026 notice ASM: Pi operational SSID and password derived from unit serial/MAC — pending head of operations approval warning action open β€” 2026-06-08
E-027 issue Find suitable LiPo battery — max 35 × 34 × 6 mm warning action open β€” 2026-06-09
E-028 issue SX1276 rejects OPMODE writes to PLL-active modes (0x82–0x85) — RF subsystem not starting blocking action open β€” 2026-06-09
E-029 notice Full BQ24075 charge cycle verified on A003460 — CC, CV, and termination confirmed info record open β€” 2026-06-10
E-030 issue RTC drift ~3180 ppm slow — internal RC oscillator, no external 32.768 kHz crystal warning next_revision open β€” 2026-06-12
E-031 notice Battery discharge test — A003460, deep sleep 1 min interval — test paused, partial results documented info record closed β€” 2026-06-12
E-032 decision Battery life target: ≥11 days at 1-minute wake interval (3.038 mA measured average current) info record open β€” 2026-06-12
E-033 notice BQ24075 charger (U1): the paired BAT pad (pin 3) and OUT pad (pin 11) are left unconnected — only one pad of each pair carries the battery … info record open β€” 2026-06-14
E-034 notice Beacon (ESH10000671 R0) — Probe design review COMPLETE. Analysis run 5: 23/23 checks addressed (100%), 71% with positive evidence, 29% hone… info record open β€” 2026-06-14
E-035 notice [CON-001] Trace cross-check — reconciling CON-001 against existing project records: (1) E-029 (full charge cycle verified on unit A003460)… info record open β€” 2026-06-14
E-036 notice Intent-grounded review pass (board 3) — re-ran the review against the Trace open-issue set, each tested vs the netlist (the FR-010 case in … info record open β€” 2026-06-14
E-037 notice U5 (PI4IOE5V6416ZDEX) exposed die pad — pin 25, named GND — is unconnected (single-point net `unconnected-(U5-GND-Pad25)`). The logic groun… info record open β€” 2026-06-15