Live demo — data resets daily at 03:00 UTC. Nothing you enter is saved.

USB-C PD Multi-Output Boost Supply 100 W

USBPD-MULTI-100W · Rev R0

in_progresselectronics

100 W USB-C PD multi-output boost supply; seven selectable fixed outputs (9/12/15/20/24/48/56 V), discrete-logic control (no MCU). Rebuilt from saved bundle.

Project visibility

This project is visible to everyone with access to Trace. Setting a passphrase hides it from all lists, search and tools until someone unlocks it.

Everything here lives inside a Project (a code + revision, e.g. ESH10000540 R3). The backbone is the V-model, read top-to-bottom: define what the product must do, plan how to prove it, execute the proof on real units, then learn from the field — and the Loop closes back up to the top.
This map is live: a block is green with a count when this project actually has that entity, and dashed/dim when it’s empty. Click any block to open its tab; hover for details. Arrows are the meaningful links; the implicit “belongs to this Project” edge is left out for legibility.

What each thing means

Requirement
One thing the product must do or satisfy — the “what”.
Test Case
A defined check that proves one or more requirements — the “how we prove it”. A verified_by trace link ties a test case to the requirement(s) it covers; that link is exactly what Coverage % counts. (So: a test case refers to the requirements it verifies.)
Verification Plan
A named grouping of test cases, approved before a test campaign and optionally gated by a milestone.
Verification Record
The result of running one test case against one unit: pass / fail / error / na. This is the evidence a requirement is actually met.
DUT
Device Under Test — an individual physical unit (by serial number) that records and test data attach to.
Deviation
A documented waiver against a verification record (e.g. accept a known non-conformance, with justification).
Entry
A knowledge note: a decision (settled choice), notice (assumption / risk / open question), issue (tracked problem), or concept (idea under exploration). It can attach to any other entity.
Design Rule
A reusable, checkable engineering constraint. Running the checks turns each violation into a Conflict.
Conflict
An open flag raised by a failed design-rule check (or an end-of-life / component-library issue) that needs resolving.
Milestone
A dated gate; verification plans can be tied to it.
Interface / Port
A contract between projects; each port can be driven by a requirement (and cascade one into the connected project).
GRR Study
A Gauge R&R study measuring how repeatable a test case’s measurement is.
Test Data
Production / Assert run results recorded against DUTs — the population behind a single verification record.
100% Coverage
94% Done
16 Requirements
26 Test Cases
8 Open Entries
No leadredNot on the weekly go-around
0 h planned 0 h logged 0 h on plan Plan versus actual →

Nobody is allocated to this project in the next 8 weeks.

Latest check-in · Wk 43 2026 Open check-in →

Nothing written for this week yet.

Nobody has written a narrative for this project yet.

Timeline

Color = derived gate state · hover a tile for its note.
overdue / blocked
Design Freeze — all open decisions closed, schematic finalised
Jun 24, 2026
overdue / blocked
Gerber Release — PCB layout complete, thermal sim done, NTC placed
Jul 15, 2026
overdue / blocked
DVT Gate
Aug 15, 2026· 1/2
overdue / blocked
First Prototype Bring-up — power-on, PD negotiation, basic output confirmed
Aug 19, 2026
overdue / blocked
DVT Exit — all test cases and VAL scenarios passed
Sep 23, 2026
overdue / blocked
Production Release — design package signed off, ready for manufacture
Oct 14, 2026
not started
🏁 Release
· 4/6

Status & gates

Chronological — Release is the final gate. Derived & read-only; edit via trace_milestone_* tools.
MS-001Design Freeze — all open decisions closed, schematic finalised overdue / blockeddue 2026-06-24
MS-002Gerber Release — PCB layout complete, thermal sim done, NTC placed overdue / blockeddue 2026-07-15
MS-DVTDVT Gate overdue / blocked 1/2 metdue 2026-08-15
met Coverage ≥ 80%
  • 16/16 requirements covered (100%)
pending Requirements approved
  • REQ-F-07: draft
  • REQ-N-01: draft
  • REQ-N-03: draft
  • REQ-P-03: draft
MS-003First Prototype Bring-up — power-on, PD negotiation, basic output confirmed overdue / blockeddue 2026-08-19
MS-004DVT Exit — all test cases and VAL scenarios passed overdue / blockeddue 2026-09-23
MS-005Production Release — design package signed off, ready for manufacture overdue / blockeddue 2026-10-14
Release / Readiness not started 4/6 met
pending Requirements approved
  • REQ-F-07: draft
  • REQ-N-01: draft
  • REQ-N-03: draft
  • REQ-P-03: draft
met Coverage ≥ 100%
  • 16/16 requirements covered (100%)
met All test cases pass
  • 25/26 passed
  • 1 accepted deviation(s): VAL-06
met No blocking issues open
met Deviations resolved
pending Interfaces frozen
  • INT-PD: not frozen
Attention 2 open entries

Test Cases

25 Pass 1 Fail / Deviated 0 N/A 0 Open0 / 26 Assert impl.

Coverage — 100.0% · Done — 93.8%

8 of 8
CodeKindTitleSeverityScopeStatusMilestoneCreated
E-001 decision Behavioural PWM controller used in simulation instead of LM5156 PSpice model info record open — 2026-06-24
E-002 decision Pure feedforward topology chosen for v8 simulation (no closed-loop control) info record open — 2026-06-24
E-003 decision Fault shutdown uses 74HC00 SR latch with NPN LED driver info record open — 2026-06-24
E-004 concept Output protection and fault-shutdown strategy info record open — 2026-06-24
E-005 concept Voltage selection logic — rotary switch vs DIP switches vs pushbutton cycle info record open — 2026-06-24
E-006 decision Discrete-logic output selection (no MCU) info record open — 2026-06-26
E-007 issue VAL-05: mismatched DIPs (Vin > Vout) pass input through warning action open — 2026-06-26
E-008 notice 56 V rail derates above 45 C ambient info record open — 2026-06-26

Reconnecting

The connection to the server dropped. Trying to pick the session back up.

Attempt 1 of 30 — next try in 0s

Session paused

This tab was disconnected to free server resources. The session is still held, so it can be picked up where you left off.

Could not reconnect

The server stopped answering and the automatic attempts have run out. It may still come back — trying once more costs nothing.

Could not resume

The paused session could not be restored. Reloading starts a fresh one; anything typed into this page and not yet saved will be lost.

This session has ended

This page was connected to a server that has since restarted, so there is no session left to rejoin. Reloading picks up the new one; anything typed into this page and not yet saved will be lost.